How do you set up a draft bar?

Answered by James Smith

Setting up a draft bar can be an exciting and rewarding experience. As a sommelier and brewer, I have had the privilege of setting up numerous draft bars throughout my career. In this detailed answer, I will guide you through the process of setting up a draft bar, step by step.

Step 1: Install top railing
The first step in setting up a draft bar is to install the top railing. This railing serves both functional and aesthetic purposes. The railing typically comes in sections that can be easily inserted into pre-drilled holes along the edge of the bar. Make sure the railing is securely attached and level to provide a sturdy and visually appealing support for your draft system.

Step 2: Install draft tower
Next, it's time to install the draft tower. The draft tower is the centerpiece of your draft bar, housing the individual faucets where the will be dispensed. To install the draft tower, you will need to feed the vinyl line through the opening in the bar and attach the gasket provided with the tower. This gasket ensures a tight seal between the tower and the bar, preventing any leaks. Once the gasket is in place, secure the draft tower to the bar using the provided hardware.

Step 3: Attach tap faucet
Now that the draft tower is securely in place, it's time to attach the tap faucets. Each faucet should have a spanner wrench included for easy installation. Using the spanner wrench, tighten the tap faucets onto the threaded shanks of the draft tower. Be careful not to overtighten, as this can damage the threads or cause leaks. Ensure that each faucet is securely attached and facing forward for ease of use.

Step 4: Attach tap handle
The final step in setting up your draft bar is to attach the tap handles to each faucet. The tap handle is what the customer will interact with when pouring their beer, so it's important to choose handles that are visually appealing and easy to grip. To attach the tap handle, simply screw it onto the top of the tap faucet. Make sure each tap handle is securely fastened and aligned with the faucet below it.

It's worth noting that setting up a draft bar is not just about the physical installation of equipment. There are several other factors to consider, such as proper cleaning and maintenance of the draft lines, temperature control, and ensuring the quality of the beer being served. These aspects are crucial for delivering a great draft beer experience to your customers.

Setting up a draft bar involves installing the top railing, attaching the draft tower, connecting the tap faucets, and securing the tap handles. Following these steps will help you create a visually appealing and functional draft bar. Remember to also consider the maintenance and quality control aspects to ensure the best possible draft beer experience. Cheers!