How do you install a draft beer system?

Answered by John Watkins

Installing a draft system can be a fun and rewarding DIY project for any beer enthusiast. Whether you're converting a fridge into a kegerator or starting from scratch, here's a step-by-step guide to help you with the installation process.

1. Choose the Right Location: Select a suitable location for your draft beer system. Consider factors like accessibility, temperature control, and space requirements. It's important to have enough room for the kegs, CO2 tank, and all the necessary components.

2. Gather the Equipment: Ensure you have all the necessary equipment and components before starting the installation process. This typically includes a kegerator conversion kit, which typically includes a draft faucet, shank, tap handle, beer and air line, keg coupler, washers, CO2 tank, and CO2 regulator. Additionally, you'll need a drill, wrench, and other basic tools.

3. Prepare the Fridge: If you're converting a fridge into a kegerator, start by cleaning and emptying the fridge. Remove any shelves or drawers that might obstruct the kegs. You may also need to drill holes in the fridge door or side to accommodate the beer and air lines.

4. Assemble the Draft Tower: Begin by attaching the draft faucet to the shank. Make sure to use the appropriate washers to create a tight seal. Once assembled, mount the draft tower on the top of the fridge or bar counter. This is where the beer will be dispensed from.

5. Connect the Lines: Next, connect the beer and air lines to the keg coupler. The beer line carries the beer from the keg to the draft tower, while the air line delivers CO2 to pressurize the keg. Use hose clamps to secure the lines in place and prevent any leaks.

6. Install the CO2 Regulator: Attach the CO2 regulator to the CO2 tank. Ensure the tank is securely fastened and the regulator is set to the desired pressure. The CO2 regulator allows you to control the carbonation level and pressure within the keg.

7. Test for Leaks: Before connecting the keg, it's crucial to test for any leaks in the system. Pressurize the system by opening the CO2 tank valve and inspect all connections. Apply a soapy solution to any potential leak points and look for bubbles. Tighten any connections if necessary.

8. Connect the Keg: connect the keg coupler to the keg. Ensure it is properly aligned and securely fastened. Open the beer line valve and slowly increase the CO2 pressure to start the flow of beer. Adjust the pressure as needed to achieve the desired pour.

9. Fine-tune and Enjoy: Once everything is set up, you can fine-tune the system by adjusting the temperature, carbonation level, and pouring speed. Different beers may require different settings, so it's worth experimenting to find the perfect pour. Now, sit back, relax, and enjoy your freshly poured draft beer!

Remember, this is just a general guide to help you get started with installing a draft beer system. It's always recommended to refer to the specific instructions provided with your conversion kit and consult with professionals or experienced homebrewers if needed.